Enterasys-networks 6H308-24 Manual de usuario Pagina 35

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 56
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 34
Completing the Installation
Installation 3-9
c. Verify that the fiber connection meets the dB loss and cable specifications for multimode
cabling, as outlined in the Cabling Guide.
If a link is not established, see Chapter 4 before contacting Enterasys Networks. Refer to “Getting
Help” in About This Guide for details.
3.6 COMPLETING THE INSTALLATION
After installing the module and making the connections to the network, proceed as follows:
1. If the chassis is installed in a rack that has strain-relief brackets, secure the cables by running the
cables along the strain-relief bracket and tying them to the bracket, using cable ties.
2. The module is now ready to be configured through Local Management. Refer to the MATRIX E7
Series and SmartSwitch 6000 Series Modules Local Management User’s Guide for information
on how to access and use Local Management. For details on how to get manuals, refer to
“Related Documents in About This Guide.
Vista de pagina 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 55 56

Comentarios a estos manuales

Sin comentarios