Enterasys Networks Smart 2200 Manual de usuario Pagina 37

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 62
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 36
Completing the Installation
Installation 3-11
3.5 COMPLETING THE INSTALLATION
After installing the 2H258-17R and any optional HSIM or VHSIM, and making the connections to
the network, proceed as follows:
1. Secure the cables by running the cables along the strain-relief bracket and tying them to the
strain-relief bracket using cable ties.
2. The 2H258-17R is now ready to be configured through Local Management. Refer to the
SmartSwitch Series 2E253, 2H252, 2H253, and 2H258 Local Management User’s Guide for
information on how to access and use Local Management.
Vista de pagina 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 61 62

Comentarios a estos manuales

Sin comentarios